You may either:
REGISTRATION
An application for registration can be made after the mini grid has been
commissioned.
PERMIT
Ordinarily, an application for a permit should be made prior to the
commencement of
installation and constructions works.
However, Regulation 10(3) of the NERC Regulations for Mini Grids, 2016,
allows
developers of
mini grids with up to 100kW distributive capacity to commence operations as
a registered
mini grid operator pending when a response is received from NERC.
REGISTRATION
Refer to the Guide for NEP Applicants published at
www.nercfasttrack.rea.gov.ng
PERMIT
Refer to the Guide for NEP Applicants published at www.nercfasttrack.rea.gov.ng
REGISTRATION
Compliance with MYTO calculation methodology is
optional.
Tariffs
may be determined on a willing seller – willing buyer basis (“Negotiated
Tariff”)
subject to
NERC’s right to intervene and set the tariff if it exceeds the threshold
prescribed in
Regulation 20(3) of the Mini Grid Regulations, 2016.
The Negotiated Tariff must be documented in an agreement between the
operator and
electricity consumers representing 60% of the electricity output in that
community. Such
agreement must be submitted to NERC for its records.
PERMIT
Compliance with MYTO calculation methodology is mandatory.
REGISTRATION
Yes. NERC requires the submission of the agreement
between the
operator and the consumers stating the tariff) (referred to above) for its
records.
PERMIT
N/A
REGISTRATION
Yes. However, the Commission may grant a derogation
from this
requirement upon an application by the mini grid operator.
PERMIT
YES
REGISTRATION
No. However, Developers of registered mini grids are
advised to
apply the minimum standards set out in Annex 7 of the Mini Grid Regulations
and apply
the
safety guidelines set out in Annex 6.
PERMIT
YES
REGISTRATION
No. Registered Mini Grid Operators do not have
rights to receive
compensation. On the DisCo’s request, a Registered Mini Grid Operator will
be required
to
de-commission and remove all its equipment within 2 months after the DisCo
has started
supplying electricity to the area.
PERMIT
Yes. If a DisCo extends its network to an isolated mini
grid operated
by
the holder of a Mini Grid Permit, the permit holder is protected and may
elect to either
convert to an Interconnected Mini Grid Operator or transfer its assets to
the DisCo in
return for compensation.
Fast Track Unit
Plot No. 1387 Cadastral Zone A00
Central Business District, Abuja
nep@nerc.gov.ng
© Copyright 2023, All right reserved by Nigerian Electrification Project (NEP).